Visual Analysis Report

I. Information

Name of Project
Measuring Instruments Model
Serial No.
Last Date of Calibration

II.Result

ID Date & Time Location Downlight Light Troffer Occupation Sensor Speaker Sprinkler Temperature Sensor Overall Progress
Detected Total Detected Total Detected Total Detected Total Detected Total Detected Total
1 Zone02_2024-03-11_14-56_2F_ZONE02_POINT39_va 1 1 0 0 0 0 0 0 0 0 0 0 100%
2 Zone02_2024-03-11_14-56_2F_ZONE02_POINT40_va 1 1 0 0 1 1 0 0 0 0 0 0 100%
3 Zone02_2024-03-11_14-56_2F_ZONE02_POINT41_va 0 0 0 0 0 0 1 1 1 1 0 0 100%
4 Zone02_2024-03-11_14-56_2F_ZONE02_POINT42_va 1 1 0 0 0 0 0 0 0 0 0 0 100%

III. Endorsement

Tested / Checked By: Signature: Post:
Tel. No.:
Date:
Witnessed By: Signature: Post:
Tel. No.:
Date: